169

Tonnage

2212

Assemblies

8947

Parts

The Project Outline

Precise DC was engaged on the basis we would be able to hit a tight schedule over a xmas break with our client wanting a complete drafting package ready on their return from holidays to enable fabrication to proceed straight away for the new year. This Junior school building was required at St Paul’s College based in South Australia and required an entire team effort to get this over the line with minimal hold ups, we successfully delivered the package on time as requested.

Location
South Australia

Athelstone

Services Provided
  • Steel Detailing
  • Assembly & Part Drawings
  • Marking Plans
  • Clash Detection
  • NC Data
Project Type
  • Government
Year

2023